Energy labels & property advice · across the Netherlands085 – 369 69 37

DUMAVA 2026 · 2026 ROUND CLOSED

DUMAVA advice before the project starts.

For eligible Dutch public-purpose property, the 2026 scheme can contribute to individual measures or an integrated sustainability project. Royal Label supplies the energy-performance substantiation within its certification scope.

Royal Label field photograph of outdoor heat-pump units
ROYAL LABEL / DUMAVA 2026 · 2026 ROUND CLOSED
Clear.
Accurate.
Delivered.
2026 round closed on 16 OctoberAdvice before starting20% individual measures30–40% integrated project
01 / OWNER

First eligibility check

DUMAVA is intended for owners of eligible existing public-purpose property, including qualifying non-residential listed buildings.

02 / BEFORE START

Arrange advice first

The sustainability advice must be prepared before applying and before entering into the implementation contract.

03 / EVIDENCE

A complete energy route

Royal Label translates the building, measures and target performance into a clear technical basis.

01 / DETAILS

The five-second DUMAVA check

Eligible owner?→Existing public-purpose property?→Advice before starting?→Check the RVO conditions

The 2026 application round ended on 16 October at 17:00. Checked on 31 October 2026: RVO lists applications as temporarily closed. Check the current RVO application process before planning any future application.

  • Do not start the work before applying
  • Check ownership and property category
  • Use the correct advice type
  • Monitor the live RVO budget

02 / DETAILS

Simple subsidy example

Eligible project costs
€100,000
×Individual-measure percentage
20%
=Indicative subsidy
€20,000

For an integrated project the basic percentage is 30% and may rise to 40% for a qualifying high energy performance. Minimums, maximums, eligible costs and the cap per square metre per label step still apply. This example is explanatory, not a subsidy decision.

  • Individual measures: generally 20%
  • Integrated project: generally 30%
  • Up to 40% at qualifying high performance
  • RVO decides eligibility and the final amount

03 / DETAILS

What Royal Label can prepare

We first establish the building use, ownership situation, intended measures and target. We then determine which energy advice, tailored advice or post-project energy label fits the route.

  • Energy-performance baseline
  • Measure packages and target performance
  • Technical evidence for the file
  • Registered post-project EPC where required

FAQ

Good to know in advance.

Can Royal Label guarantee the subsidy?+

No. RVO assesses the applicant, property, costs and measures. Royal Label supplies technical energy advice and evidence within the agreed scope.

Can work start before the application?+

The RVO process states that you should apply before commissioning the contractor or starting the sustainability work. Always check the current official conditions.

Is a new EPC always required after completion?+

For an integrated project a new registered EPC is generally required. RVO states exceptions for listed buildings and individual measures; verify the current conditions for your project.

FREE INTAKE

Ready to schedule?

Share the address, service and deadline for a suitable quotation.

NO-OBLIGATION ENQUIRY

Tell us about your property.

A few details. A clear next step.

Your enquiry is non-binding. We agree the price and timing in advance.

Your details are used to handle your enquiry. A copy is kept in protected hosting storage.

A MORE EFFICIENT BUILDING STARTS WITH INSIGHT

Ready for the next step?

Tell us about your property. We will help you plan the next step.

Request your quotation
Call usRequest a quote