Start with the design
Share drawings, building use, floor areas, material specifications and the intended submission date.
BENG + MPG
Request energy-performance and material-impact calculations together. Align the same design, specifications and installations before submitting your building plans.

Share drawings, building use, floor areas, material specifications and the intended submission date.
BENG assesses energy performance. MPG assesses material impact. Neither replaces the other.
Scope, design version, reporting, options and the delivery schedule are agreed before commissioning.
01 / DETAILS
Insulation, glazing, solar panels and building services can affect both assessments. Coordinating them makes conflicting assumptions visible while design choices can still change.
We agree one design version and explicitly scope two separate calculations. A combined package does not replace separate compliance checks.
02 / DETAILS
Dutch new-construction MPG rules changed on 1 July 2026, including the A2 method with 19 environmental categories and requirements for more building uses. Applicability and limits depend on building use, size, form and the relevant application date.
We check the framework during intake. Older scores are not directly comparable with A2 results, and not every renovation automatically requires a new-construction MPG assessment.
03 / DETAILS
MPG is also available separately. Already have one assessment? Share the latest calculations so that assumptions can be aligned. Final EPC registration is separate unless expressly included.
04 / DETAILS
Provide the address, building use, number of units, gross floor area, plans, elevations and sections. Add material build-ups, quantities, specifications and the installation concept where available.
State the project phase and submission date. Missing information, the implementation route, reporting and revisions are agreed before commissioning. Daylight, ventilation, structural calculations and permit submission are not automatically included.
FAQ
Yes. Select MPG in the enquiry form. Scope, price and delivery are confirmed before commissioning.
No. They are separate assessments. The combined offer explicitly scopes and coordinates both.
You receive one quotation specifying both assessments, reporting, any design options and revisions. The price depends on the agreed project scope.
No. The competent authority assesses the complete application. Calculation deliverables and any support are agreed in advance.
FREE INTAKE
Share the address, service and deadline for a suitable quotation.
VRIJBLIJVENDE INTAKE
Deel het adres, de gewenste dienst en deadline. We bevestigen de passende scope, prijs en planning.