An approach that suits
your building.
At handover, the materials and systems actually installed must be substantiated. Collect evidence during construction. Design information and the completed building must correspond.
What can you expect?
- Check as-built information
- Review supporting evidence
- Register the final energy performance
Make a well-prepared start.
As-built drawings, material specifications, construction photographs and system declarations.
No complete file yet? Tell us what information is available when you enquire. We discuss what is still needed and what can be established during an inspection. For several properties, also provide the addresses and the intended goal for each building.
A preliminary design calculation is not the same as the final energy label at handover.
From enquiry to result.
- 1
Enquire
Tell us about the property and your requirements.
- 2
On-site assessment
We record the relevant building features.
- 3
Results & explanation
You receive the agreed report, with a clear explanation.
Clear pricing and timing before you start.
The scope depends on the property type, size and available information. During your enquiry, we discuss the deadline, any special requirements and the work included in the quotation. You place an order only once the arrangements are clear.
Request a quotation
